Question
Construct a triangle with sides 5 cm 6 cm and 7 cm and then another triangle whose sides are $\frac{3}{5}$ of the corresponding sides of the first triangle.

Similar questions

A two-digit number is 3 more than 4 times the sum of its digits. If 8 is added to the number, the digits are reversed. Find the number.
Three consecutive vertices of a parallelogram are (-2, 1), (1, 0) and (4, 3). Find the fourth vertex.
Find the sum of all odd numbers between:
0 and 50
Solve the following systems of equations:
$\frac{5}{\text{x}+\text{y}}-\frac{2}{\text{x}-\text{y}}=-1,$
$\frac{15}{\text{x}+\text{y}}+\frac{7}{\text{x}-\text{y}}=10.$
The angle of elevation of the top of an unifinished tower at a distance of 75m from its base is 30°. How much higher must the tower be raised so that the angle of elevation of its top at the same point may be 60°? $\big[\text{Take}\sqrt{3}=1.732\big]$
A tent is in the form of a cylinder of diameter 20m and height 2.5m, surmounted by a cone of equal base and height 7.5m. Find the capacity of the tent and the cost of the canvas at Rs 100 per square metre.
Compare the modal ages of two groups of students appearing for an entrance test:
Age (in years)
16-18
18-20
20-22
22-24
24-26
Group A
50
78
46
28
23
Group B
54
89
40
25
17
The mean of the following frequency distribution is 18. The frequency f in the class interval 19-21 is missing. Determine f.
Class interval11-1313-1515-1717-1919-2121-2323-25
Frequency36913f54
A man walks a certain distance with certain speed. If he walks $\frac{1}{2}$km an hour faster, he takes 1 hour less. But, if he walks 1km an hour slower, he takes 3 more hours. Find the distance covered by the man and his original rate of walking.
A takes 10 days less than the time taken by B to finish a piece of work. If both A and B together can finish the work in 12 days, find the time taken by B to finish the work.