Question
Evaluate the definite integral in Exercise:
$\int^{\frac{\pi}{2}}_{0}\sin2\text{x}\tan^{-1}(\sin\text{x})\text{dx}$

Answer

$\text{Let I}=\int^{\frac{\pi}{2}}_{0}\sin2\text{x}\tan^{-1}(\sin\text{x})\text{dx}=\int^{\frac{\pi}{2}}_{0}2\sin\text{x}\cos\text{x}\tan^{-1}(\sin\text{x})\text{dx} $
Also, let $\sin\text{x}=\text{t}=\ \Rightarrow\cos\text{x}\ \text{dx}=\text{dt}$
when $\text{x}=0,\text{t}=0$ and when $\text{x}=\frac{\pi}{2},=1$
$\Rightarrow \text{I}=2\int^{1}\limits_{0}\text{t}\cdot\tan^{-1}\text{t dt}$
Consider $\int\text{t}.\tan^{-1}\text{dt}=\tan^{-1}\text{t}.\int\text{t}\ \text{dt}-\int\left\{\frac{\text{d}}{\text{dt}}(\tan^{-1}\text{t)}\int\text{t}\ \text{dt}\right\}\text{dt}$
$=\tan^{-1}\text{t}.\frac{\text{t}^{2}}{2}-\int\frac{1}{1+\text{t}^{2}}.\frac{\text{t}^{2}}{2}\text{dt}$
$=\frac{\text{t}^{2}\tan^{-1}\text{t}}{2}-\frac{1}{2}\int\frac{\text{t}^{2}+1-1}{1+\text{t}^{2}}\text{dt}$
$=\frac{\text{t}^{2}\tan^{-1}\text{t}}{2}-\frac{1}{2}\int1\text{dt}+\frac{1}{2}\int\frac{1}{1+\text{t}^{2}}\text{dt}$
$=\frac{\text{t}^{2}\tan^{-1}\text{t}}{2}-\frac{1}{2}.\text{t}+\frac{1}{2}\tan^{-1}\text{t}$
$\Rightarrow\int^{1}\limits_{0}\text{t}.\tan^{-1}\text{t}\ \text{dt}=\bigg[\frac{\text{t}^{2}.\tan^{-1}\text{t}}{2}-\frac{\text{t}}{2}+\frac{1}{2}\tan^{-1}\text{t}\bigg]^{1}_{0}$
$=\frac{1}{2}\bigg[\frac{\pi}{4}-1+\frac{\pi}{4}\bigg]$
$=\frac{1}{2}\bigg[\frac{\pi}{4}-1\bigg]=\frac{\pi}{4}-\frac{1}{2}$
From equation (1), we obtain
$\text{I}=2\bigg[\frac{\pi}{4}-\frac{1}{2}\bigg]=\frac{\pi}{2}-1$

Need a full question paper?

Generate a complete, print-ready paper with questions like this in minutes — across 16+ boards, with answer keys.

Start Generating Free

Similar questions

A manufacturer has employed 5 skilled men and 10 semi-skilled men and makes two models A and B of an article. The making of one item of model A requires 2 hours work by a skilled man and 2 hours work by a semi-skilled man. One item of model B requires 1 hour by a skilled man and 3 hours by a semi-skilled man. No man is expected to work more than 8 hours per day. The manufacturer’s profit on an item of model A is Rs. 15 and on an item of model B is Rs. 10. How many of items of each model should be made per day in order to maximize daily profit? Formulate the above LPP and solve it graphically and find the maximum profit.
The two equal sides of an isosceles $\triangle$ with fixed base b are decreasing at the rate of $3 cm/s$. How fast is the area decreasing when the two equal sides are equal to the base?
Find the equation of the curve that passes through the point (0, a) and is such that at any point (x, y) on it, the product of its slope and the ordinate is equal to the abscissa.
Differentiate the following functions with respect to x:
$\tan^{-1}\Big(\frac{\text{a}+\text{bx}}{\text{b}-\text{ax}}\Big)$
Evaluate the follwing intregals:
$\int\frac{1}{\text{x}^4-1}\text{ dx}$
Solve the following initial value problems:
$\text{x}\frac{\text{dy}}{\text{dx}}-\text{y}=(\text{x}+1)\text{e}^{\text{x}},\text{ y}(1)=0$
Find the area common to the circle $x^2 - y^2 = 16\  a^2$ and the parabola $y^2 = 6x.$
Find the shortest distance between the following pairs of lines whose vector equation are:
$\vec{\text{r}}=\big(\hat{\text{i}}+2\hat{\text{j}}+3\hat{\text{k}}\big)+\lambda\big(2\hat{\text{i}}+3\hat{\text{j}}+4\hat{\text{k}}\big)$ and $\vec{\text{r}}=\big(2\hat{\text{i}}+4\hat{\text{j}}+5\hat{\text{k}}\big)+\mu\big(3\hat{\text{i}}+4\hat{\text{j}}+5\hat{\text{k}}\big)$
If P(A) = 0.4, P(B) = 0.8, $\text{P}\Big(\frac{\text{B}}{\text{A}}\Big)=0.6$. Find $\text{P}\Big(\frac{\text{A}}{\text{B}}\Big)$ and $\text{P}(\text{A}\cap\text{B}).$
If the area bounded by the parabola $y^2 = 4ax$ and the line y = mx is $\frac{\text{a}^2}{12}\text{ sq.}$ units, then using integration, find the value of m.