Question
Evaluate the following integrals:
$\int\big\{\tan(\log\text{x})+\sec^2(\log\text{x})\big\}\text{dx}$

Answer

Let $\text{I}=\int\big\{\tan(\log\text{x})+\sec^2(\log\text{x})\big\}\text{dx}$
Let $\log\text{x}=\text{z}$
$\Rightarrow\text{x = e}^{\text{z}}$
$\Rightarrow\text{dx}=\text{e}^{\text{z}}\text{dz}$
$\therefore\text{I}=\int\big\{\tan\text{z}+\sec^2\text{z}\big\}\text{e}^{\text{z}}\text{dz}$
Here, $\text{f(z)}=\tan\text{z}$ and $\text{f}'\text{(z)}=\sec^2\text{z}$
And we know that
$\int\text{e}^{\text{ax}}(\text{af(x)}+\text{f}'(\text{x}))\text{dx}=\text{e}^{\text{ax}}\text{f(x) + C}$
$\therefore\int\text{e}^{\text{z}}\big\{\tan\text{z}+\sec^2\text{z}\big\}\text{dz}=\text{e}^{\text{z}}\tan\text{z + C}$
$\therefore\text{I}=\text{x}\tan(\log\text{x})+\text{C}$

Need a full question paper?

Generate a complete, print-ready paper with questions like this in minutes — across 16+ boards, with answer keys.

Start Generating Free

Similar questions

Show that the set of all prime numbers is infinite.
A cottage industry manufactures pedestal lamps and wooden shades, each requiring the use of grinding/cutting machine and sprayer. It takes 2 hours on the grinding/cutting machine and 3 hours on the sprayer to manufacture a pedestal lamp while it takes 1 hour on the grinding/cutting machine and 2 hours on the sprayer to manufacture a shade. On any day, the sprayer is available for at most 20 hours and the grinding/cutting machine for at most 12 hours. The profit from the sale of a lamp is Rs. 5.00 and a shade is Rs. 3.00. Assuming that the manufacturer can sell all the lamps and shades that he produces, how should he schedule his daily production in order to maximise his profit?
Find the equation of the plane that is perpendicular to the plane 5x + 3y + 6z + 8 = 0 and which contains the line of intersection of the planes x + 2y + 3z - 4 = 0, 2x + y - z + 5 = 0.
Prove that:
$\begin{vmatrix}\text{a}-\text{b}-\text{c}&2\text{a}&2\text{a}\\2\text{b}&\text{b}-\text{c}-\text{a}&2\text{b}\\2\text{c}&2\text{c}&\text{c}-\text{a}-\text{b} \end{vmatrix}=(\text{a}+\text{b}+\text{c})^3$
Find the vector equations of the coordinate planes.
Find the equation of a curve passing through origin and satisfying the differential equation $(1+\text{x}^2)\frac{\text{dy}}{\text{dx}}+2\text{xy}=4\text{x}^2.$
An aeroplane can carry a maximum of 200 passengers. A profit of Rs. 400 is made, on each executive class ticket and a profit of Rs. 600 is made on each economy class ticket. The airline reserves at least 20 seats for executive class. However at least 4 times as many passengers prefer to travel by economy class than by executive class. Formulate linear programming problem in order to maximize the profit for the airline.
Differentiate the following functions with respect to x:
$\cos^{-1}\big\{2\text{x}\sqrt{1-\text{x}^2}\big\},\frac{1}{\sqrt{2}}<\text{x}<1$
Integrate the function in Exercise:
$(\sin^{-1}\text{x})^2$
Assume that a rain drop evaporates at a rate proportional to its surface area. Form a differential equation involving the rate of change of the radius of the rain drop.