Question
Evaluate the following integrals:
$\int\limits^{\frac{\pi}{3}}_{-\frac{\pi}{3}}\frac{1}{1+\text{e}^{\tan\text{x}}}\text{ dx}$

Answer

Let $\text{I}=\int\limits^{\frac{\pi}{3}}_{-\frac{\pi}{3}}\frac{1}{1+\text{e}^{\tan\text{x}}}\text{ dx}\ ...(\text{i})$
Then,
$\text{I}=\int\limits^{\frac{\pi}{3}}_{-\frac{\pi}{3}}\frac{1}{1+\text{e}^{\tan\big[\frac{\pi}{3}+\big(-\frac{\pi}{3}\big)-\text{x}\big]}}\text{ dx}$ $\Bigg[\int\limits^{\text{a}}_{0}\text{f(x)}\text{dx}=\int\limits^{\text{a}}_{\text{0}}\text{f}(\text{a}-\text{x})\text{dx}\Bigg]$ 
$=\int\limits^{\frac{\pi}{3}}_{-\frac{\pi}{3}}\frac{1}{1+\text{e}^{\tan(-\text{x})}}\text{ dx}$
$=\int\limits^{\frac{\pi}{3}}_{-\frac{\pi}{3}}\frac{1}{1+\text{e}^{-\tan\text{x}}}\text{ dx}$
$=\int\limits^{\frac{\pi}{3}}_{-\frac{\pi}{3}}\frac{\text{e}^{\tan\text{x}}}{\text{e}^{\tan\text{x}}+1}\text{ dx}\ ...{\text{(ii)}}$
Adding (i) and (ii) we get
$2\text{I}=\int\limits^{\frac{\pi}{3}}_{-\frac{\pi}{3}}\frac{\text{e}^{1+\tan\text{x}}}{\text{e}^{1+\tan\text{x}}}\text{ dx}$
$\Rightarrow2\text{I}=\int\limits^{\frac{\pi}{3}}_{-\frac{\pi}{3}}\text{dx}$
$\Rightarrow2\text{I}=\big[\text{x}\big]^{\frac{\pi}{3}}_{-\frac{\pi}{3}}$
$\Rightarrow2\text{I}=\frac{\pi}{3}-\Big(-\frac{\pi}{3}\Big)$
$\Rightarrow2\text{I}=\frac{2\pi}{3}$
$\Rightarrow\text{I}=\frac{\pi}{3}$

Need a full question paper?

Generate a complete, print-ready paper with questions like this in minutes — across 16+ boards, with answer keys.

Start Generating Free

Similar questions

Solve the follwing system of equations by matrix method: $5x + 2y = 3 , 3x + 2y = 5$
$\int\frac{\text{x}}{\sqrt{\text{x}+\text{a}}-\sqrt{\text{x}+\text{b}}}\text{dx}$
Evaluate the following integrals:$\int\sin^{-1}\Big(\frac{2\text{x}}{1+\text{x}^2}\Big)\text{dx}$
A factory manufactures two types of screws, A and B. Each type of screw requires the use of two machines, an automatic and a hand operated. It takes 4 minutes on the automatic and 6 minutes on hand operated machines to manufacture a package of screws A, while it takes 6 minutes on automatic and 3 minutes on the hand operated machines to manufacture a package of screws B. Each machine is available for at the most 4 hours on any day. The manufacturer can sell a package of screws A at a profit of Rs 7 and screws B at a profit of Rs 10. Assuming that he can sell all the screws he manufactures, how many packages of each type should the factory owner produce in a day in order to maximise his profit? Determine the maximum profit.
A manufacturing company makes two models $A$ and $B$ of a product. Each piece of model $A$ requires $9$ labour hours for fabricating and $1$ labour hour for finishing.  Each piece of model $B$ requires $12$ labour hours for fabricating and $3$ labour hours for finishing. For fabricating and finishing, the maximum labour hours available are $180$ and $30$ respectively. The company makes a profit of $Rs. 8000$ on each piece of model $A$ and $Rs. 12000$ on each piece of model $B.$ How many pieces of model $A$ and model $B$ should be manufactured per week to realise a maximum profit? What is the maximum profit per week$?$
Using differentials, find the approximate values of the following:
$(66)^{\frac{1}{3}}$
Find the values of a and b, if the function f defined by
$\text{f}(x) = \begin{cases} x^{2} + 3x + \text{a} \text{ }, & x \leq 1\\ bx + 2 \text{ }\text{ }\text{ }\text{ }\text{ }\text{ }\text{ }\text{ }\text{ }\text{ },& x > 1\\ \end{cases}$
is differentiable at x = 1.
Evaluvate the following intregals:
$\int\frac{8\cot\text{x}+1}{3\cot\text{x}+2}\ \text{dx}$
Find the angle between the lines whose direction cosines are given by the equations
$l + 2m + 3n = 0$ and $3lm - 4ln + mn = 0$
If $\text{A}=\begin{vmatrix}2&5\\2&1\end{vmatrix}$ and $\text{B}=\begin{vmatrix}4&-3\\2&5\end{vmatrix},$ verify that |AB| = |A| |B|.