Question
Evaluate the following integrals:
$\int\limits^{\frac{\pi}{3}}_{\frac{\pi}{6}}\frac{\sqrt{\sin\text{x}}}{\sqrt{\sin\text{x}}+\sqrt{\cos\text{x}}}\text{ dx}$

Answer

Let $\text{I}=\int\limits^{\frac{\pi}{3}}_{\frac{\pi}{6}}\frac{\sqrt{\sin\text{x}}}{\sqrt{\sin\text{x}}+\sqrt{\cos\text{x}}}\text{ dx}\ ...(\text{i})$
Then,
$\text{I}=\int\limits^{\frac{\pi}{3}}_{\frac{\pi}{6}}\frac{\sqrt{\sin\big(\frac{\pi}{3}+\frac{\pi}{6}-\text{x}\big)}}{\sqrt{\sin\big(\frac{\pi}{3}+\frac{\pi}{6}-\text{x}\big)}+\sqrt{\cos\big(\frac{\pi}{3}+\frac{\pi}{6}-\text{x}\big)}}\text{ dx}$ $\Bigg[\int\limits^{\text{b}}_{\text{a}}\text{f(x)}\text{dx}=\int\limits^{\text{b}}_{\text{a}}\text{f}(\text{a}+\text{b}-\text{x})\text{dx}\Bigg]$
$=\int\limits^{\frac{\pi}{3}}_{\frac{\pi}{6}}\frac{\sqrt{\sin\big(\frac{\pi}{2}-\text{x}\big)}}{\sqrt{\sin\big(\frac{\pi}{2}-\text{x}\big)}+\sqrt{\cos\big(\frac{\pi}{2}-\text{x}\big)}}\text{ dx}$
$=\int\limits^{\frac{\pi}{3}}_{\frac{\pi}{6}}\frac{\sqrt{\cos\text{x}}}{\sqrt{\cos\text{x}}+\sqrt{\sin\text{x}}}\text{ dx}\ ...(\text{ii})$
Adding (i) and (ii) we get
$2\text{I}=\int\limits^{\frac{\pi}{3}}_{\frac{\pi}{6}}\frac{\sqrt{\sin\text{x}}+\sqrt{\cos\text{x}}}{\sqrt{\sin\text{x}}+\sqrt{\cos\text{x}}}\text{ dx}$
$\Rightarrow2\text{I}=\int\limits^{\frac{\pi}{3}}_{\frac{\pi}{6}}\text{dx}$
$\Rightarrow2\text{I}=\Big[\text{x}\Big]^{\frac{\pi}{3}}_{\frac{\pi}{6}}$
$\Rightarrow2\text{I}=\frac{\pi}{3}-\frac{\pi}{6}=\frac{\pi}{6}$
$\Rightarrow\text{I}=\frac{\pi}{12}$

Need a full question paper?

Generate a complete, print-ready paper with questions like this in minutes — across 16+ boards, with answer keys.

Start Generating Free

Similar questions

Solve the differential equation $\frac{\text{dy}}{\text{dx}}=1+\text{x}+\text{y}^2+\text{x}\text{y}^2,$ when y = 0, x = 0.
A manufacturer produces nuts and bolts. It takes 1 hour of work on machine A and 3 hours on machine B to produce a package of nuts. It takes 3 hours on machine A and 1 hour on machine B to produce a package of bolts. He earns a profit of  17.50 per package on nuts and  7 per package of bolts. How many packages of each should be produced each day so as to maximise his profits if he operates his machines for at the most 12 hours a day? Form the above as a linear programming problem and solve it graphically.
Integrate the rational function in exercise: $\frac{1}{(\text{e}^\text{x}-1)} [$Hint: Put $e^x = t]$
At what points on the curve $y = x^2 - 4x + 5$ is the tangent perpendicular to the line $2y + x = 7?$
Find the area of the region bounded by the curve $y^2 = 4x$ and the line $x = 3.$
Find the value of $\lambda$ for which the four points with position vectors
$-\hat{\text{j}}-\hat{\text{k}},4\hat{\text{i}}+5\hat{\text{j}}+\lambda\hat{\text{k}},3\hat{\text{i}}+9\hat{\text{j}}+4\hat{\text{k}}$ and $-4\hat{\text{i}}+4\hat{\text{j}}+4\hat{\text{k}}$ are co planar.
If $\text{x}-\text{e}^{\tan\text{x}}+\sqrt{\frac{\text{x}^2+1}{2}},$ find $\frac{\text{dy}}{\text{dx}}$
Evaluate the following integrals:
$\int\limits^1_0\frac{1-\text{x}^2}{\text{x}^4+\text{x}^2+1}\text{ dx}$
Prove that:
$\begin{vmatrix}1&\text{b}+\text{c}&\text{b}^2+\text{c}^2\\1&\text{c}+\text{a}&\text{c}^2+\text{a}^2\\1&\text{a}+\text{b}&\text{a}^2+\text{b}^2 \end{vmatrix}=(\text{a}+\text{b})(\text{b}-\text{c})(\text{c}-\text{a})$
Evaluate the following integrals:
$\int_{0}^\limits{{2\pi}}\sqrt{1-\sin\frac{\text{x}}{2}}\text{ dx}$