Question
Evaluate the following integrals:
$\int\limits^{\frac{\pi}{2}}_{-\frac{\pi}{2}}\sin\text{x}|\sin\text{x}|\text{dx}$

Answer

$\int\limits^{\frac{\pi}{2}}_{-\frac{\pi}{2}}\sin\text{x}|\sin\text{x}|\text{dx}$
$=\int\limits^{0}_{-\frac{\pi}{4}}\sin\text{x}|\sin\text{x}|\text{dx}+\int\limits_{0}^{\frac{\pi}{2}}\sin\text{x}|\sin\text{x}|\text{dx}$
$=\int\limits^{0}_{-\frac{\pi}{4}}\sin\text{x}(-\sin\text{x})\text{dx}+\int\limits_{0}^{\frac{\pi}{2}}\sin\text{x}(\sin\text{x})\text{dx}$ $\begin{pmatrix}|\sin\text{x}|=\begin{cases}\sin\text{x},&0\leq\text{x}\leq\frac{\pi}{2}\\-\sin\text{x},&-\frac{\pi}{4}\leq\text{x}\leq0\end{cases} \end{pmatrix} $
$=\int\limits^{0}_{-\frac{\pi}{4}}\sin^2\text{x dx}+\int\limits_{0}^{\frac{\pi}{2}}\sin^2\text{x dx}$
$=-\int\limits^{0}_{-\frac{\pi}{4}}\frac{1-\cos2\text{x}}{2}\text{ dx}+\int\limits_{0}^{\frac{\pi}{2}}\frac{1-\cos2\text{x}}{2}\text{ dx}$
$=-\frac{1}{2}\int\limits^{0}_{-\frac{\pi}{4}}\text{dx}+\frac{1}{2}\int\limits^{0}_{-\frac{\pi}{4}}\cos2\text{x dx}+\frac{1}{2}\int\limits_{0}^{\frac{\pi}{2}}\text{dx}-\frac{1}{2}\int\limits_{0}^{\frac{\pi}{2}}\cos2\text{x dx}$
$=-\frac{1}{2}\times\big[\text{x}\big]^0_\frac{\pi}{4}+\frac{1}{2}\times\Big[\frac{\sin2\text{x}}{2}\Big]^0_{\frac{\pi}{2}}+\frac{1}{2}\times\big[\text{x}\big]^{\frac{\pi}{2}}_0-\frac{1}{2}\times\Big[\frac{\sin2\text{x}}{2}\Big]^{\frac{\pi}{2}}_0$
$=-\frac{1}{2}\Big(0+\frac{\pi}{4}\Big)+\frac{1}{4}(0+1)+\frac{\pi}{4}-\frac{1}{4}(0-0)$
$=\frac{\pi}{8}+\frac{1}{4}$

Need a full question paper?

Generate a complete, print-ready paper with questions like this in minutes — across 16+ boards, with answer keys.

Start Generating Free

Similar questions

If $\begin{vmatrix}\text{p}&\text{q}&\text{c}\\\text{a}&\text{q}&\text{c}\\\text{a}&\text{b}&\text{r} \end{vmatrix}=0,$ find the value of $\frac{\text{p}}{\text{p}-\text{a}}+\frac{\text{q}}{\text{q}-\text{b}}+\frac{\text{r}}{\text{r}-\text{c}},$ $\text{p}\neq\text{a},\text{q}\neq\text{b},\text{r}\neq\text{c}.$
Evaluate the following integrals:
$\int\limits^{\frac{\pi}{2}}_0\frac{\text{dx}}{1+\tan\text{x}}$
Find the value of x if $\begin{bmatrix}1&\text{x}&1\end{bmatrix}\begin{bmatrix}1&3&2\\2&5&1\\15&3&2\end{bmatrix}\begin{bmatrix}1\\2\\\text{x}\end{bmatrix}=0$
Two bad eggs are accidently mixed up with ten good ones. Three eggs are drawn at random with replacement from this lot. Compute the mean for the number of bad eggs drawn.
Find the points of local maxima or local minima and corresponding local maximum and local minimum values of the following functions. Also, find the points of inflection,
$f(x) = x^3 - 2ax^3 + a^2x$
Two institutions decided to award their employees for the three values of resourcefulness, competence and determination in the form of prices at the rate of Rs. x, y and z respectively per person. The first institution decided to award respectively 4, 3 and 2 employees with a total price money of Rs. 37000 and the second institution decided to award respectively 5, 3 and 4 employees with a total price money of Rs. 47000. If all the three prices per person together amount to Rs. 12000 then using matrix method find the value of x, y and z. What values are described in this equations?
Find the absolute maximum and the absolute minimum value of the following functions in the given intervals:
$\text{f}(\text{x})=4\text{x}-\frac{\text{x}^{2}}{2}\ \text{in}\ [2,4,5]$
Find the equations of the tangent and the normal to the following curves at the indicated points.
$y = x^2$ at $(0, 0)$
The top of a ladder 6 metres long is resting against a vertical wall on a level pavement, when the ladder begins to slide outwards. At the moment when the foot of the ladder is 4 metres from the wall, it is sliding away from the wall at the rate of 0.5m/ sec. How fast is the top-sliding downwards at this instance?
How far is the foot from the wall when it and the top are moving at the same rate?
A factory manufactures two types of screws, A and B, each type requiring the use of two machines - an automatic and a hand-operated. It takes 4 minute on the automatic and 6 minutes on the hand-operated machines to manufacture a package of screws 'A', while it takes 6 minutes on the automatic and 3 minutes on the hand-operated machine to manufacture a package of screws 'B'. Each machine is available for at most 4 hours on any day. The manufacturer can sell a package of screws 'A' at a profit of 70 P and screws 'B' at a profit of Rs. 1. Assuming that he can sell all the screws he can manufacture, how many packages of each type should the factory owner produce in a day in order to maximize his profit? Determine the maximum profit.