MCQ
Find the principal values of: $\tan ^{-1}(\sqrt{3})$
  • A
    $\frac{\pi}{6}$
  • $\frac{\pi}{3}$
  • C
    $\frac{2 \pi}{3}$
  • D
    $\frac{5 \pi}{6}$

Answer

Correct option: B.
$\frac{\pi}{3}$
(b) : Let $\tan ^{-1}(\sqrt{3})=\theta \Rightarrow \tan \theta=\sqrt{3}=\tan \frac{\pi}{3}$
$\Rightarrow \theta=\frac{\pi}{3} \in\left(\frac{-\pi}{2}, \frac{\pi}{2}\right)$
$\therefore$ Principal value of $\tan ^{-1} \sqrt{3}$ is $\frac{\pi}{3}$.

Need a full question paper?

Generate a complete, print-ready paper with questions like this in minutes — across 16+ boards, with answer keys.

Start Generating Free

Similar questions

If m[-3 amp; 4] + n[-3 amp; 4] = [10 amp;-11], then 3m + 7n =
$y + {x^2} = \frac{{dy}}{{dx}}$ has the solution
A square $ABCD$ of diagonal $2a$ is folded along the diagonal $AC$ so that the planes $DAC$ and $BAC$ are at right angle. The shortest distance between $DC$ and $AB$ is
The equation of family of curves for which the length of the normal is equal to the radius vector is
Let $f: I R \rightarrow I R$ be defined as $f(x)=|x|+\left|x^2-1\right|$. The total number of points at which $f$ attains either a local maximum or a local minimum is
If points (1, 2), (3, 5) and (0, b) are collinear the value of b is:
The derivative of $f(x) = |x{|^3}$ at $x = 0$ is
If $\left[ {\begin{array}{*{20}{c}}3&1\\4&1\end{array}} \right]X = \left[ {\begin{array}{*{20}{c}}5&{ - 1}\\2&3\end{array}} \right],$then $X =$
Apply linear programming to this problem. A firm wants to determine how many units of each of two products (products D and E) they should produce to make the most money. The profit in the manufacture of a unit of product D is 100 and the profit in the manufacture of a unit of product E is100 and the profit in the manufacture of aunit of product E is 87. The firm is limited by its total available labor hours and total available machine hours. The total labor hours per week are 4,000. Product D takes 5 hours per unit of labor and product E takes 7 hours per unit. The total machine hours are 5,000 per week. Product D takes 9 hours per unit of machine time and product E takes 3 hours per unit. Which of the following is one of the constraints for this linear program?
Differential coefficient of $\sqrt{\sec \sqrt{x}}$ is