MCQ
${\sin ^{ - 1}}\left( {\frac{3}{5}} \right) + {\tan ^{ - 1}}\left( {\frac{1}{7}} \right) = $
  • $\frac{\pi }{4}$
  • B
    $\frac{\pi }{2}$
  • C
    ${\cos ^{ - 1}}\left( {\frac{4}{5}} \right)$
  • D
    $\pi $

Answer

Correct option: A.
$\frac{\pi }{4}$
a
(a) ${\sin ^{ - 1}}\frac{3}{5} + {\tan ^{ - 1}}\frac{1}{7} = {\tan ^{ - 1}}\frac{3}{4} + {\tan ^{ - 1}}\frac{1}{7}$

$ = {\tan ^{ - 1}}\left( {\frac{{(3/4) + (1/7)}}{{1 - (3/4) \times (1/7)}}} \right) $

$= {\tan ^{ - 1}}\left( {\frac{{25}}{{25}}} \right) = {\tan ^{ - 1}}1 = \frac{\pi }{4}$.

Need a full question paper?

Generate a complete, print-ready paper with questions like this in minutes — across 16+ boards, with answer keys.

Start Generating Free

Similar questions

If $f:R \to R$, is a continuous function such that $\left| {f\left( x \right) - f\left( y \right)} \right| \geqslant \left| {{e^x} - {e^y}} \right|\forall x,y \in R$ then $f(x)$ is
The value of c in Rolle's theorem for the function $\text{f}(\text{x})=\frac{\text{x}(\text{x}+1)}{\text{e}^{\text{x}}}$ defined on [-1, 0] is:
  1. $0.5$
  2. $\frac{1+\sqrt5}{2}$
  3. $\frac{1-\sqrt5}{2}$
  4. $-0.5$
The general solution of the differential equation $\frac{\text{dy}}{\text{dx}}+\text{y}\ \text{g}(\text{x})=\text{g}(\text{x})\ \text{g}'(\text{x})$ is a given function of x, is:
  1. $\text{g}(\text{x})+\log(1+\text{y}+\text{g}(\text{x}))=\text{C}$
  2. $\text{g}(\text{x})+\log(1+\text{y}-\text{g}(\text{x}))=\text{C}$
  3. $\text{g}(\text{x})-\log(1+\text{y}-\text{g}(\text{x}))=\text{C}$
  4. None of these.
If $\text{P(B)}=\frac{3}{5},\text{P}(\text{A}|\text{B})=\frac{1}{2}$ and $\text{P}(\text{A}\cup\text{B})=\frac{4}{5},$ then $\text{P}(\text{B}|\overline{\text{A}})=$
  1. $\frac{1}{5}$
  2. $\frac{3}{10}$
  3. $\frac{1}{2}$
  4. $\frac{1}{2}$
Apply linear programming to this problem. A firm wants to determine how many units of each of two products (products D and E) they should produce to make the most money. The profit in the manufacture of a unit of product D is 100 and the profit in the manufacture of a unit of product E is100 and the profit in the manufacture of aunit of product E is 87. The firm is limited by its total available labor hours and total available machine hours. The total labor hours per week are 4,000. Product D takes 5 hours per unit of labor and product E takes 7 hours per unit. The total machine hours are 5,000 per week. Product D takes 9 hours per unit of machine time and product E takes 3 hours per unit. Which of the following is one of the constraints for this linear program?
If every row of a matrix A contains p elements and its column contains q elements, then the order of A is:
  1. p × p
  2. q × q
  3. p × q
  4. q × p
Five fair coins are tossed simultaneously. The probability of the events that atleast one head comes up is
The principal value of $\cot ^{-1}(-\sqrt{3})$ is
Let $A=\left[\begin{array}{lll}2 & 0 & 1 \\ 1 & 1 & 0 \\ 1 & 0 & 1\end{array}\right], B=\left[B_1, B_2, B_3\right]$, where $B_1$, $\mathrm{B}_2, \mathrm{~B}_3$ are column matrices, and $\mathrm{AB}_1=\left[\begin{array}{l}1 \\ 0 \\ 0\end{array}\right]$, $\mathrm{AB}_2=\left[\begin{array}{l}2 \\ 3 \\ 0\end{array}\right], \mathrm{AB}_3=\left[\begin{array}{l}3 \\ 2 \\ 1\end{array}\right]$ If $\alpha=|B|$ and $\beta$ is the sum of all the diagonal elements of $B$, then $\alpha^3+\beta^3$ is equal to
The number that exceeds its square by the greatest amount is