Question
Solve the Linear Programming Problem graphically:
Minimise Z = x + 2y subject to 2x + y $\ge$ 3, x + 2y $\ge$ 6, x, y $\ge$ 0.

Answer

Get the step-by-step solution for this question inside the Vidyadip app.

Get the answer in the app

Need a full question paper?

Generate a complete, print-ready paper with questions like this in minutes — across 16+ boards, with answer keys.

Start Generating Free

Similar questions

Find the equation of the plane through the intersection of the planes 3x - 4y + 5z = 10 and 2x + 2y - 3z = 4 and parallel to the line x = 2y = 3z.
Evaluate the following definite integrals:
$\int_{1}^\limits{4}\frac{\text{x}^2+\text{x}}{\sqrt{2\text{x}+1}}\text{ dx}$
A(1, 0, 4) B(0, -11, 1), C(2, -3, 1) are three points and D is the fool of perpendicular from A on BC. Find the coordinates of D.
Show that $\begin{vmatrix}\text{x}-3&\text{x}-4&\text{x}-\alpha\\\text{x}-2&\text{x}-3&\text{x}-\beta\\\text{x}-1&\text{x}-2&\text{x}-\gamma\end{vmatrix}=0,$ where $\alpha,\beta,\gamma$ are in A.P.
Show that the points A(-1, 4, -3), B(3, 2, -5), C(-3, 8, -5) and D(-3, 2, 1) are coplanar.
A box manufacturer makes large and small boxes from a large piece of cardboard. The large boxes require 4 sq. metre per box while the small boxes require 3 sq. metre per box. The manufacturer is required to make at least three large boxes and at least twice as many small boxes as large boxes. If 60 sq. metre of cardboard is in stock, and if the profits on the large and small boxes are Rs. 3 and Rs. 2 per box, how many of each should be made in order to maximize the total profit?
If $\sin^{-1}\text{x}+\sin^{-1}\text{y}=\frac{\pi}{3}$ and $\cos^{-1}\text{x}-\cos^{-1}\text{y}=\frac{\pi}{6},$ find the values of x and y.
Evaluate the following integrals:
$\int\limits^1_{-1}|\text{x}\cos\pi\text{x}|\text{dx}$
Find the area of the region bounded by the curve $y = x^3$ and $y = x + 6$ and $x = 0.$
A publisher sells a hard cover edition of a text book for Rs. 72.00 and paperback edition of the same ext for Rs. 40.00. Costs to the publisher are Rs. 56.00 and Rs. 28.00 per book respectively in addition to weekly costs of Rs. 9600.00. Both types require 5 minutes of printing time, although hardcover requires 10 minutes binding time and the paperback requires only 2 minutes. Both the printing and binding operations have 4,800 minutes available each week. How many of each type of book should be produced in order to maximize profit?