Question
What is the amount of work done in bringing a mass from the surface of Earth on one side to a point diametrically opposite to the other side?

Answer

Since gravitational potential difference is zero therefore the work done is zero.

Need a full question paper?

Generate a complete, print-ready paper with questions like this in minutes — across 16+ boards, with answer keys.

Start Generating Free