MCQ
When mismatch between plan and actual performance is due to over or under stating of plan, then it is called
  • Strategic Control
  • B
    Operational Control
  • C
    Both (a) and (b)
  • D
    None of the above

Answer

Correct option: A.
Strategic Control
(a)