A foreman wants to process 4 different jobs on three machines: a shaping machine, a drilling machine, and a tapping, the sequence of operations being shaping-drilling-tapping. Decide the optimal sequence for the four jobs to minimize the total elapsed time. Also, find the total elapsed time and the idle time for every machine.
JobSHAPING (MINUTES)DRILLING (MINUTES)TRAPPING (MINUTES)
113318
21884
38613
42368

Answer